DALI Lighting System for Manchester Airport, Terminal 2
LOYTEC Technology saves money and protects the environment
In terminal 2 of Manchester Airport, a new and modern DALI Lighting System was installed. Equipped with LOYTEC components, the highly efficient system allows annual savings of approximately 3,000 MWH. Responsible for the implementation was the British LOYTEC systems integrator Calon, who integrated the modern DALI lighting system with constant light control and occupancy detection, in cooperation with the company Building Environment Control. The lighting system is integrated in the airport’s building management system (BMS) and flight control systems via BACnet. This allows automatic configuration at each gate according to the flight departure and arrival schedules, time of day, and ambient light level.
Read more in the full press release or download the photo in high resolution.


At the Constantinus European Award Europe’s best consulting and IT companies compete for the honor to become nominated or awarded for outstanding quality. The international jury of FEACO, the European Federation of Management Consultancies Associations, awarded the silver medal to LOYTEC. The award ceremony took place in Madrid on May 29th, 2014. Criteria for the award are commercial performance, strategic strength, quality of solution, efficiency, and international impact. LOYTEC received the silver medal for the international project “Energy Efficiency in Japan – Sony Corporation Tokyo”, a L-INX based solution for the
In summer 2013, the extension of the LOYTEC headquarters was completed. Equipped with the LOYTEC L-ROC room automation system, the highest efficiency class AA could be reached in course of the eu.bac system audit in March 2014. This was made possible through the complete integration of the functions heating/cooling, sunblind, and lighting.