Case studies

Business Park Vienna, Austria, 2015

MR-TechThe great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.

Poinciana High School, USA, 2015

Poinciana High SchoolThe LOYTEC Competence Partner TBI was awarded the project of replacing the building automation system in the oldest area of Poinciana High School. The project consisted of 37 AHUs (Air Handling Units), 2 chiller plants and 164 VAV (Variable Air Volume) units.

Hotel Management School Belvoirpark, Switzerland, 2015

Hotel Management School BelvoirparkPentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.

Secondary School Loulé, Algarve, Portugal, 2015

Secondary School Loulé, Algarve, Portugal, 2015In the course of Portugal's Secondary School’s Modernization Program, the secondary school Loulé in the Algarve region has been modernized by RACE using LOYTEC products. 

Fire Directorate, Kuwait, 2015

Fire Directorate, KuwaitThe Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.