Case studies

ラングストラーサホテル(ドイツ・バーデンバーデン、2016)

Baden-BadenLangestraße 100 in Germany is a newly built 5-star rated design hotel with 130 spacious rooms and suites, a state-of-the-art medical center with 15 medical specialists, an apartment building with 16 flats and a two-storey underground garage with 200 parking spaces.

Delta Electronics Beijing Office, China, 2017

Delta Electronics Beijing OfficeThe U.S. Green Building Council (USGBC) has just granted the LEED NC (New Construction) Silver Certification to Delta Electronics’ Beijing Office. Delta’s Beijing office has demonstrated an impressive 20% cut in overall energy costs as compared to the annual baseline reference of the 2007 ASHREA standard 90.1. 

マンチェスター空港(イギリス・マンチェスター、2016)

Manchester AirportAfter the successful implementation of a lighting control system for the public areas of Manchester Airport's terminal 2, the LOYTEC Competence Center Calon in cooperation with the company Building Environment Control, have now extended the very same lighting control solution to the public areas of the airport’s terminals T1 & T3.

シュルンベルジェ工場(フランス・ゲブヴィレール、2016)

NSC SchlumbergerThe subsidiary of Arcom, Arcom Alsace Lorraine installed a building automation system that allows the Schlumberger factory to be monitored and managed completely automatically while allowing the users to override the system locally.

コンティネンテハイパーマーケット Nova Arcada (ポルトガル・ブラガ、2016)

Continente Hypermarket, Braga Nova ArcadaThe LOYTEC Competence Partner RACE installed a total control solution for the Continente Hypermarket, Braga Nova Arcada based on LOYTEC components. The solution integrates all systems of the store from refrigeration to HVAC and lighting and allows for increased energy efficiency and transparent management of the technical equipment.