Case studies

Hypermarket in Alor Setar - Kedah, Malaysia 2014

Hypermarket in Alor Setar - Kedah, MalaysiaThe LOYTEC partner M&C Engineering and Trading Sdn Bhd implemented a project for a new hypermarket in Alor Setar - Kedah, Malaysia. There, LOYTEC’s powerful LINX-110 Automation Servers extended with L-IOB I/O Modules are in charge of controlling and monitoring the hypermarkets’ systems. 

Quartier 17, Hanseatic City Stralsund, Germany, 2014

Quartier 17A project of the LOYTEC Competence Partner Dr. Diestel regarding control and visualization of different room air conditioning systems of the newly built Quartier 17 in the Hanseatic City Stralsund in Germany.

Heatherbrae Elementary School, Arizona, USA, 2014

MPBASThe LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.

Camões Building, Porto, Portugal, 2014

Camões BuildingThe Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.

Shopping Center Allegro, Setúbal, Portugal, 2014

Allegro SetúbalThe shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.