Case studies

AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015

AIM Recycling CenterThe AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.

Penal Institution Schwerte, Germany, 2015

JVA Schwerte The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte. 

Rheinwerk 3, Bonn, Germany, 2015

Rheinwerk3, GermanyRheinwerk 3 is a premium office facility located in the former German capital Bonn. Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs.

Continente Hypermarket, Matosinhos, Portugal, 2015

Hypermarket Continente, MatosinhosThe LOYTEC Competence Partner RACE implemented a new building management system using the latest technology of LOYTEC in the Continente Hypermarket in Matosinhos, Portugal.

Osceola County Health Department, Poinciana, Florida, 2014

Osceola County Health DepartmentOsceola County Health Department is a five million dollar medical facility in Florida. For the control of the HVAC system of the building, the LOYTEC Competence Partner Total Building Integrations Inc. installed an ALL-IP BACnet system with LOYTEC components.