Case studies

Passeio das Águas Shopping, Brazil, 2013

Passeio das Aguas ShoppingIn the "Passeio des Aguas Shopping", a newly built shopping center in Goiânia, Brazil, the LOYTEC systems integrator RACE installed HVAC, lighting, and energy metering systems, controlled and monitored by LOYTEC components.>

Parc Hotel Alvisse, Dommeldange, Luxembourg, 2013

Parc Hotel Alvisse, LuxemburgThe PARC HOTEL ALVISSE**** was equipped with the latest technology in the course of a total renovation. L-INX Automation Servers, L-VIS Touch Panels and L-IP Routers of LOYTEC were installed that are now responsible, among other things, for visualization and integration of the indivudual room controllers of the hotel rooms.

LOYTEC Headquarters, Vienna, Austria, 2014

LOYTEC_Headquarters_BG37Therevolutionary room automation system L-ROC proves its capabilities in the new LOYTEC headquarters, where it automates heating/cooling, sunblinds, and lighting.

Manchester Airport, Manchester, Great Britain, 2013

Terminal 2 - Manchester AirportThe LOYTEC systems integrator Calon in cooperation with the company Building Environment Control integrated a modern DALI lighting system with constant light control and occupancy detection in the Manchester Airport, terminal 2.

Maintenance facility Herdern, Zurich, Switzerland, 2014

Serviceanlage HerdernSwiss Federal Railways (SBB AG) extended the maintenance facility Herdern at the Herdern-Areal in Zurich-Altstetten to one of the most modern maintenance facilities for service and repair work. PentaControl AG was entrusted by the general contractor Allreal AG with the complete building automation, whereby it applied latest technologies.