Case studies

王立オーストラリア空軍ピアース基地(オーストラリア・パース、2016 )

raafThe Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.

OBIホームセンター(ドイツ・ニュルンベルク、2016)

OBI market NurembergThe OBI home improvement store in Nuremberg, a two-story building with a retail area of approximately 12,000 m2, was built in February 2014. For lighting control the building automation system was equipped with a LOYTEC DALI lighting system. 

パメリア ヒルトン ホテル(オーストラリア・パース、2016 )

Parmelia HotelThe company BCS was commissioned to upgrade the existing Chiller Controls in the Parmelia Hilton. The new system provides the hotel operator with improved monitoring and control features and delivers extensive experience values for energy efficient operations.

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015NAPP Pharmaceuticals based at the Cambridge Science Park in Cambridge employed both the consultancy and engineering divisions of the LOYTEC Competence Partner SGCI for the design and commissioning of a complex lighting control solution based on the open standard of DALI.

シティ・ オブ・ロッキングハム (オーストラリア・パース、2016)

City of RockinghamThe LOYTEC Competence Partner Building Control Systems was engaged to modernize the existing BMS of the City of Rockingham – a local city council – for a reliable and accurate operation