Case studies

EWS24 Office Building in Frankfurt/Main, Germany, 2021

DekaBank Frankfurt a.M. Copyright @ Lang & Cie. Real Estate AGThe EWS24 building project with more than 50,000 m² gross floor area was built by the project developer "Lang & Cie. Real Estate AG" and has already been fully leased. Read how LOYTEC L-ROC room automation and the high-quality LPAD-7 touch room control unit keep tenant comfort and flexibility high and support a DGNB certification.

The Oval, Office Building in Düsseldorf, Germany, 2021

Foto: Patrick NiemeyerThe new construction project "The Oval" was designed as a digital, sustainable and state-of-the-art office building. Equipped with LOYTEC's L-ROC room automation system, tenants can enjoy a flexible and energy-efficient office building that has already succeeded in winning awards.

Shanghai Oriental Hospital, Shanghai 2019

Shanghai Oriental HospitalThe Shanghai Oriental Hospital experiences significant improvements of the operational efficiency using the LOYTEC Building Automation Solution. Read more about this challenging success story!

TFF Football Federation Building in Riva, Turkey, 2019

football 1331843 1920The new Turkey Football Federation training facility at the Black Sea is an impressive building complex. Read which LOYTEC products are the core of the facility's HVAC automation solution.

Logistic Center in Piacenza, Italy, 2019

piacenzaThe logistic center located in Piacenza supplies the region of Southern Europe for a major European retailer. With sustainability in mind, the furniture store company went for a retrofit of their lighting solution. Take a look at the energy savings potential of modern lighting control systems by LOYTEC!