Etudes de cas

The Hub, IT Office Building, Bangalore, India 2017

The Hub, IT Office Building, Bangalore, India 2017In search for a reliable VAV solution for the five floor IT Business Building of Brillio LOYTEC BMS LWEB-900 was the first choice. Have a look at the solution that was successfully implemented.

Ecole de garçons Ishbylia, Koweït, 2017

Ishbylia boysAprès la mise en œuvre réussie d'une GTB centralisée à l’école des filles Ishblyia, le ministère de l'éducation du Koweït a également attribué AHMED ISHAQ pour ce projet scolaire pour garçons. Jetez un coup d'œil aux détails du projet !

Ishbylia Intermediate Girls School, Koweït, 2017

IshbyliaPour la gestion technique des bâtiments d’enseignement, le ministère de l'Éducation du Koweït a demandé une GTB centralisée. Ces systèmes de gestion technique doivent fonctionner et s'intégrer au système mécanique, au système électrique et à toute la basse tension pour la surveillance, le contrôle et la supervision. 

Delta Electronics Beijing Office, China, 2017

Delta Electronics Beijing OfficeThe U.S. Green Building Council (USGBC) has just granted the LEED NC (New Construction) Silver Certification to Delta Electronics’ Beijing Office. Delta’s Beijing office has demonstrated an impressive 20% cut in overall energy costs as compared to the annual baseline reference of the 2007 ASHREA standard 90.1. 

Langestraße 100, Baden-Baden, Allemagne, 2016

Baden-BadenPrès de la Festspielhaus Baden-Baden, le plus grand opéra et salle de concert d'Allemagne, un groupe de bâtiments est en cours de construction avec un hôtel cinq étoiles comme élément central.

Centre commercial ParkLake, Bucarest, Roumanie, 2016

ParkLakeLa société Sonae Sierra vient d’ouvrir les portes d’un tout nouveau centre commercial appelé Parklake à Bucarest en Roumanie, offrant à ses visiteurs "une nouvelle expérience shopping dans un vaste espace combinant un design respectueux de l’environnement avec une offre distincte de loisirs et de sport."

Hontai Plaza, Ningbo, Chine, 2016

Hontai PlazaHontai Plaza est un complexe urbain important qui domine au milieu de l'étalement du port oriental de la Chine, Ningbo. Avec une superficie totale de 0,7 million de mètres carrés, le Hontai Plaza est un centre névralgique qui comprend un centre commercial haut de gamme, des immeubles de bureaux classés 5A, un hôtel 5 étoiles, un centre de loisirs, un marché de produits gastronomiques et des installations de loisirs, le touten restectant le style de vie à la mode.

Gare ferroviaire interurbaine de Zhaoqing, Chine, 2016

Zhaoquing RailwayLe chemin de fer interurbain de Foshan-Zhaoqing a ouvert en Chine le 30 mars 2016, dans le cadre du réseau interurbain de transport ferroviaire du delta de la rivière des Perles. La gare de Zhaoqing, avec une superficie de construction de 13 000 mètres carrés, est devenu un repère important de la ville de Zhaoqing après son achèvement.

Aéroport de Manchester, Manchester, Grande Bretagne, 2016

Manchester AirportLa société Calon, Competence Center LOYEC, en coopération avec la société Building Environment Control a mis en place courant 2013 un système d’éclairage moderne basé sur DALI pouvant gérer la détection de présence ainsi que la régulation de l’éclairage au sein du Terminal 2 de l’aéroport de Manchester. Et lors des phases de déploiement suivantes, cette même solution de contrôle de l’éclairage a été étendue aux zones recevant du public au sein des Terminaux T1 & T3, avec pour ambition la réduction de la consommation énergétique aidée par le remplacement des luminaires existants par une solution entièrement basée sur les LED.

Le Supermarché Continente du Nova Arcada à Braga au Portugal, 2016

Continente Hypermarket, Braga Nova ArcadaRACE, Competence Partner de LOYTEC vient d’installer une solution de contrôle complète basée sur les produits LOYTEC dans l'hypermarché Continente, dans le centre commercial appelé Nova Arcada situé à Braga. La solution intègre tous les systèmes du magasin à partir de la réfrigération jusqu’à la CVC et l'éclairage de façon à permettre une efficacité énergétique accrue et une gestion transparente des équipements techniques.

Royal Australian Air Force, Pearce Base, Perth, Australia, 2016

raafThe Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.

Parmelia Hotel (Hilton), Perth, Australia, 2016

Parmelia HotelThe company BCS was commissioned to upgrade the existing Chiller Controls in the Parmelia Hilton. The new system provides the hotel operator with improved monitoring and control features and delivers extensive experience values for energy efficient operations.

Fremantle Esplanade Hotel (Rydges), Australia, 2016

Fremantle_Esplanade_HotelThe LOYTEC Competence Partner Building Control Systems was engaged to replace the existing building management system of the Rydges Hotel in Fremantle, a heritage listed 4.5 star hotel.

City of Rockingham, Perth, Australia, 2016

City of RockinghamThe LOYTEC Competence Partner Building Control Systems was engaged to modernize the existing BMS of the City of Rockingham – a local city council – for a reliable and accurate operation

OBI Market Nuremberg, Germany, 2016

OBI market NurembergThe OBI home improvement store in Nuremberg, a two-story building with a retail area of approximately 12,000 m2, was built in February 2014. For lighting control the building automation system was equipped with a LOYTEC DALI lighting system. 

Schlumberger Factory, Guebwiller, France, 2016

NSC SchlumbergerThe subsidiary of Arcom, Arcom Alsace Lorraine installed a building automation system that allows the Schlumberger factory to be monitored and managed completely automatically while allowing the users to override the system locally.

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015NAPP Pharmaceuticals based at the Cambridge Science Park in Cambridge employed both the consultancy and engineering divisions of the LOYTEC Competence Partner SGCI for the design and commissioning of a complex lighting control solution based on the open standard of DALI. 

University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015

University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015The Lincoln University approached the LOYTEC Competence Partner SGCI to come up with a cost viable solution to replace the old building management system with the caveat to drastically improve user comfort within the building and occupied spaces as well as reducing energy consumption.

PAMA west al jahra branch, Kuwait, 2015

PAMA west al jahra branch, Kuwait, 2015Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.

PAMA fahd al ahmad branch, Kuwait, 2015

PAMA fahd al ahmad branch, Kuwait, 2015The LOYTEC Competence Partner Ahmed Isaq Co. integrated electrical and mechanical systems in the PAMA fahd al ahmad branch in Kuwait, the seat of the public authority of minority affairs.

Poinciana High School, USA, 2015

Poinciana High SchoolThe LOYTEC Competence Partner TBI was awarded the project of replacing the building automation system in the oldest area of Poinciana High School. The project consisted of 37 AHUs (Air Handling Units), 2 chiller plants and 164 VAV (Variable Air Volume) units.

Business Park Vienna, Austria, 2015

MR-TechThe great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.

District Office Sigmaringen, Germany, 2015

District Office SigmaringenAt the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.

AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015

AIM Recycling CenterThe AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.

L'école hôtelière Belvoirpark, Suisse, 2015

Hotel Management School BelvoirparkL'école hôtelière Belvoirpark est l'école hôtelière la plusL'école hôtelière Belvoirpark est l'école hôtelière la plusmoderne de Suisse. L'environnement hautement professionnelledu nouveau bâtiment se retrouve dans lesystème de contrôle de PentaControl AG. La GTB LWEB-900 de LOYTEC assure un contrôle optimal du chauff age,de la climatisation et de la ventilation.