Planned website maintenance!
Our website will be offline from
10:00 AM CEST (08:00 UTC) to 12:00 AM CEST (10:00 UTC)
on May the 12th.
Etudes de cas
University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015
District Office Sigmaringen, Germany, 2015
At the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.
PAMA west al jahra branch, Kuwait, 2015
Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.
Heatherbrae Elementary School, Arizona, USA, 2014
The LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.
Continente Hypermarket, Matosinhos, Portugal, 2015
The LOYTEC Competence Partner RACE implemented a new building management system using the latest technology of LOYTEC in the Continente Hypermarket in Matosinhos, Portugal.
Rheinwerk 3, Bonn, Germany, 2015
Rheinwerk 3 is a premium office facility located in the former German capital Bonn. Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs.
Penal Institution Schwerte, Germany, 2015
The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.
Fire Directorate, Kuwait, 2015
The Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.
Quartier 17, Hanseatic City Stralsund, Germany, 2014
A project of the LOYTEC Competence Partner Dr. Diestel regarding control and visualization of different room air conditioning systems of the newly built Quartier 17 in the Hanseatic City Stralsund in Germany.
Camões Building, Porto, Portugal, 2014
The Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.
L'école hôtelière Belvoirpark, Suisse, 2015
L'école hôtelière Belvoirpark est l'école hôtelière la plusL'école hôtelière Belvoirpark est l'école hôtelière la plusmoderne de Suisse. L'environnement hautement professionnelledu nouveau bâtiment se retrouve dans lesystème de contrôle de PentaControl AG. La GTB LWEB-900 de LOYTEC assure un contrôle optimal du chauff age,de la climatisation et de la ventilation.
Hypermarket in Alor Setar - Kedah, Malaysia
The LOYTEC partner M&C Engineering and Trading Sdn Bhd implemented a project for a new hypermarket in Alor Setar - Kedah, Malaysia. There, LOYTEC’s powerful LINX-110 Automation Servers extended with L-IOB I/O Modules are in charge of controlling and monitoring the hypermarkets’ systems.
Shopping Center Allegro, Setúbal, Portugal, 2014
The shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.
Hospitals Senhor do Bonfim, Portugal, 2014
The private health care institution „Hospitals Senhor do Bonfirm“ (HSB) is equipped with modern and innovative facilities at national and European level that were built with excellent materials. Many of them are used for the first time in Portugal. The systems for building automation were installed and implemented by the LOYTEC system integrator RACE.
AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015
The AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.
Hotel Royal Óbidos, Portugal, 2014
The five-star Evolutee Hotel is located in the western region of Portugal. Only materials and techniques that meet environmental standards were used for the construction of the building, along with the efficient technology of LOYTEC that was implemented by the LOYTEC systems integrator RACE.
RMZ Galleria, Bangalore, India, 2014
The retail, office, and hotel block "Galleria" in India receives a comprehensive BMS solution from the LOYTEC systems integrator Venba Tech, including monitoring an controlling of air handlers, ventilation and plumbing system, and lighting.
AKDR Tower, Chennai, India, 2013
The Indian LOYTEC systems integrator Venba Tech implemented the building management software for the AKDR Tower, an IT building in Chennai that mainly houses information technology companies.
Raiffeisenbank, Lieboch-Stainz, Austria, 2013
A sustainable and comprehensive renovation of a bank branch, considering ecological, economical, and social aspects, carried out by the LOYTEC systems integrator EAM Systems GmbH.
Passeio das Águas Shopping, Brazil, 2013
In the "Passeio des Aguas Shopping", a newly built shopping center in Goiânia, Brazil, the LOYTEC systems integrator RACE installed HVAC, lighting, and energy metering systems, controlled and monitored by LOYTEC components.>
Parc Hotel Alvisse, Dommeldange, Luxembourg, 2013
The PARC HOTEL ALVISSE**** was equipped with the latest technology in the course of a total renovation. L-INX Automation Servers, L-VIS Touch Panels and L-IP Routers of LOYTEC were installed that are now responsible, among other things, for visualization and integration of the indivudual room controllers of the hotel rooms.
LOYTEC Headquarters, Vienna, Austria, 2014
The revolutionary room automation system L-ROC proves its capabilities in the new LOYTEC headquarters, where it automates heating/cooling, sunblinds, and lighting.
Aéroport de Manchester, Manchester, Grande Bretagne, 2013
Calon, intégrateur système LOYTEC, en association avec la société Building Environment Controls a mis en place un système d’éclairage moderne DALI comprenant un contrôle de niveau d’éclairage constant ainsi que la détection de présence, le tout au sein du Terminal 2 de l’aéroport de Manchester.
Maintenance facility Herdern, Zurich, Switzerland, 2014
Swiss Federal Railways (SBB AG) extended the maintenance facility Herdern at the Herdern-Areal in Zurich-Altstetten to one of the most modern maintenance facilities for service and repair work. PentaControl AG was entrusted by the general contractor Allreal AG with the complete building automation, whereby it applied latest technologies.
"The Warehouse", Copenhagen, Denmark, 2013
“The Warehouse” in Copenhagen is a new office building for different tenants. The new building needed an appropriate automation system for automating the functions of ventilation, heating/cooling, and lighting.
COWI Headquarters, Copenhagen, Denmark, 2013
COWI is one of the largest consultant engineering companies in Denmark. Its headquarters is situated in Kongens Lyngby just outside the center of Copenhagen. In course of a total renovation of the building it was necessary to implement a Building Management System for ventilation, heating, and lighting.
Institute for Physical Chemistry, Kiel, Germany, 2013
The Institute for Physical Chemistry of Christian-Albrechts University (CAU) at Kiel, Germany, was reconstructed. In particular, the installation of the ventilation system and the associated building automation system was commissioned.
Rexholm Logistics Center, Holstebro, Denmark, 2012
In September 2012 the construction of the new REXHOLM distribution center and warehouse was completed. The new 15,000 square meters facility is the central point for REXHOLM’s textile business in Scandinavia.
California Plaza Parking Garage, California, USA, 2012
City of Chandler, Municipal Buildings, Arizona, USA, 2012
The City of Chandler, Arizona, marks 100 years of age in May 2012. Chandler describes itself as “an All-America City where entrepreneurial spirit and hometown traditions intermingle to make Chandler a truly fun place to be. Chandler has exceptional services, a diverse culture and a vibrant history.”
Olympus Oil Rig, Gulf of Mexico, USA, 2012
Offshore oil rigs have stringent design considerations for mechanical and control systems. Special materials and durability is a must to last in the conditions of salt air. This requires that the mechanicals have special skills.
St. Louis Zoo, Missouri, USA, 2012
Sea Lion Sound is a new exhibit for the Zoo of St. Louis, opening in June 2012. According to the zoo's website: “For the first time anywhere in North America, visitors will walk through an underwater tunnel into the sea lions' habitat to see the animals swimming all around them!....
Sony Corporation Sony City Osaki, Tokyo, Japan, 2012
The R&D facility of Sony Corporation at Sony City Osaki is equipped with a wide range of energy-saving features that ensure an outstanding environmental performance. These include....
Kuhlenwall Karree, Duisburg, Germany, 2012
The administration building of Sparkasse Duisburg, situated at a first class location in Duisburg’s downtown, became revitalized entirely. In constructional and ecological terms the building was brought to an as-good-as-new-level.
Holzhafen Hamburg West, Hamburg, Germany, 2011
Located between the traditional Hamburg fish market and the ferry terminals, “Holzhafen Hamburg” is one of the top addresses on the river Elbe. This is the location of the office building “Holzhafen West”, whose style is inspired by typical Hamburg storage buildings.
Rigshospitalet Copenhagen, Denmark, 2011
Ernst & Young Headquarters Sydney, Australia
New high-rise Ernst & Young Center in Sydney, Australia comprises the main tower of 44 levels offering minimum A grade quality accommodation. The building benefits from a central core with full height double glazed windows, allowing excellent natural light and views from the upper levels to all elevations.
Il sole 24 ore - Head Office, Milan, Italy
With the head office of Italy’s leading financial journal ‘Il sole 24 ore’, a building complex with more than 1,200 office and conference rooms and a surface area of 48,000 m² arose.
Kröller-Müller Museum, Otterlo, Netherlands, 2011
One of the most attractive museums in the Netherlands is the Kröller-Müller Museum near Otterlo. Situated in the center of the De Hoge Veluwe National Park, it exhibits the world’s second largest collection of Van Gogh paintings.
School District of Decatur Township, Indianapolis, USA, 2011
The Decatur Intermediate Learning Center and local district Sports Center, located in the Decatur Township, Indiana USA, faced a situation common to many modern schools with a building having multiple use requirements throughout the week for regular and extracurricular activities. To maximize energy savings on equipment usage the ability to schedule occupancy properly has become a must.
Governor Rockefeller Empire State Plaza, Albany, USA
The Governor Nelson A. Rockefeller Empire State Plaza (commonly known as the Empire State Plaza or less formal as The South Mall) is a complex of several state buildings in downtown Albany, New York State.
Landesmesse Stuttgart, Germany
The 'Landesmesse Stuttgart' is a state-of-the-art showground with architectural and functional convincing buildings. A widely ramified CEA-709 network takes care of lighting and shading.
Landesbank Baden-Württemberg (LBBW), Stuttgart, Germany, 2009
The building of the ‘Landesbank Baden-Württemberg LBBW’ with a surface area of 58,000 m² is located 300 meters away from the central station of Stuttgart, Germany. The most important goal was to create a comfortable room climate for the employees and at the same time keep the operating costs low.
Rheinhallen (RTL Studios), Cologne, Germany, 2011
It’s a building of superlatives: the biggest building site in Germany while under construction, one of the largest office complexes all over Europe and the biggest one in Germany, measured by its gross floor area of 160,000 square meters. And Europe’s biggest private TV station has moved in, the RTL media group....