Case studies
パメリア ヒルトン ホテル(オーストラリア・パース、2016 )
Devices: LINX-211, LIOB-550, LWEB-803
The company BCS was commissioned to upgrade the existing Chiller Controls in the Parmelia Hilton. The new system provides the hotel operator with improved monitoring and control features and delivers extensive experience values for energy efficient operations.
エスプラネード フリーマントルホテル(オーストラリア、2016)
Devices: LINX-220, LINX-221, LIOB-580, LIOB-10x,
LIOB-15x, LWEB-803, LWEB-802, LWEB-900
The LOYTEC Competence Partner Building Control Systems was engaged to replace the existing building management system of the Rydges Hotel in Fremantle, a heritage listed 4.5 star hotel.
シティ・ オブ・ロッキングハム (オーストラリア・パース、2016)
Devices: LINX-220, LINX-221, LIOB-580, LIOB-10x,
LIOB-15x, LINX-211, LIOB-55x, LWEB-900
The LOYTEC Competence Partner Building Control Systems was engaged to modernize the existing BMS of the City of Rockingham – a local city council – for a reliable and accurate operation
OBIホームセンター(ドイツ・ニュルンベルク、2016)
Devices: LDALI-ME204, LVIS-ME212, LDALI-PWR4-U, LPOW-2415B
The OBI home improvement store in Nuremberg, a two-story building with a retail area of approximately 12,000 m2, was built in February 2014. For lighting control the building automation system was equipped with a LOYTEC DALI lighting system.
シュルンベルジェ工場(フランス・ゲブヴィレール、2016)
Devices: LINX-120, LIOB-100, LIOB-101, LIOB-102, LIOB-A2,
LVIS-3ME12-A1, LPOW-2415A, L-MBUS20, LWEB-900
The subsidiary of Arcom, Arcom Alsace Lorraine installed a building automation system that allows the Schlumberger factory to be monitored and managed completely automatically while allowing the users to override the system locally.
NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015
Devices: LDALI-3E102, LDALI-3E104, LINX-111,
LDALI-PWR2-U, LDALI-PWR4-U, L-VIS
NAPP Pharmaceuticals based at the Cambridge Science Park in Cambridge employed both the consultancy and engineering divisions of the LOYTEC Competence Partner SGCI for the design and commissioning of a complex lighting control solution based on the open standard of DALI.
続きを読む: NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015
University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015
Devices: LINX-150, LINX-111, L-IOB I/O,
LIOB-180, L-VIS, LPOW-2415A, LPOW-2415B
The Lincoln University approached the LOYTEC Competence Partner SGCI to come up with a cost viable solution to replace the old building management system with the caveat to drastically improve user comfort within the building and occupied spaces as well as reducing energy consumption.
続きを読む: University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015
PAMA fahd al ahmad branch, Kuwait, 2015
Devices: LINX-121, LIOB-150, LIOB-152, LIOB-151, LWEB-802
The LOYTEC Competence Partner Ahmed Isaq Co. integrated electrical and mechanical systems in the PAMA fahd al ahmad branch in Kuwait, the seat of the public authority of minority affairs.
PAMA west al jahra branch, Kuwait, 2015
Devices: LINX-151, LIOB-550, LDALI-3E104, LDALI-PWR4-U, LDALI-MS1, LWEB-900
Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.
Poinciana High School, USA, 2015
Devices: LIOB-484, LIOB-480, LIOB-451, L-POW, LIP-3ECTB
The LOYTEC Competence Partner TBI was awarded the project of replacing the building automation system in the oldest area of Poinciana High School. The project consisted of 37 AHUs (Air Handling Units), 2 chiller plants and 164 VAV (Variable Air Volume) units.
Business Park Vienna, Austria, 2015
Devices: LINX-150/151, L-IP, L-Switch, LIOB I/O Module,
LIOB I/O Controller, LENO-800, LWEB-803
The great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.
District Office Sigmaringen, Germany, 2015
Devices: LIP-3333ECTB, LIP-33ECTB, LINX-150/151,
LIOB-100/101, LIOB-A2, L-Proxy, LT-33, L-MBUS20
At the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.
AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015
Devices: LINX-221, LIOB-582, LVIS-3ME212-xx
LIOB-101/LIOB-102
The AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.
続きを読む: AIM Recycling Center, Saint-Augustin-de-Desmaures, Canada, 2015
Hotel Management School Belvoirpark, Switzerland, 2015
Devices: L-INX, LVIS-3ME15-xx, LWEB-900
PentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.
続きを読む: Hotel Management School Belvoirpark, Switzerland, 2015
Secondary School Loulé, Algarve, Portugal, 2015
Devices: LINX-220, LINX-210, LIOB-A2, LIOB-100/101/102,
LIOB-150, LIOB-151, LWEB-900
In the course of Portugal's Secondary School’s Modernization Program, the secondary school Loulé in the Algarve region has been modernized by RACE using LOYTEC products.
Fire Directorate, Kuwait, 2015
Devices: LINX-151, LIOB-550, LPOW-2415A, LPOW2415-B,
LDALI-PWR2-U, LDALI-E101-U, LDALI-3E102, LWEB-900
The Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.
Penal Institution Schwerte, Germany, 2015
Devices: LINX-221, LINX-210, LIOB-550/551/552, LIOB-580/581, LVIS-ME200
The LOYTEC Competence Partner AAG GmbH from Wülfrath in Germany has been awarded the contract for the re- and new construction of control cabinets for the plant automation of the penal institution Schwerte.
Rheinwerk 3, Bonn, Germany, 2015
Devices: LGATE-950, LIP-3ECTB, LDALI-3E102, LVIS-3ME12
Rheinwerk 3 is a premium office facility located in the former German capital Bonn. Kieback & Peter used LOYTEC product solutions to implement a DALI lighting control system and to provide operations for the conference rooms and for the rooms via desktop PCs.
Osceola County Health Department, Poinciana, Florida, 2014
Osceola County Health Department is a five million dollar medical facility in Florida. For the control of the HVAC system of the building, the LOYTEC Competence Partner Total Building Integrations Inc. installed an ALL-IP BACnet system with LOYTEC components.
続きを読む: Osceola County Health Department, Poinciana, Florida, 2014
Continente Hypermarket, Matosinhos, Portugal, 2015
Devices: LINX-220, LINX-210, LINX-120, LINX-110,
LIOB-151, LIOB-152, L-MBUS, LWEB-900
The LOYTEC Competence Partner RACE implemented a new building management system using the latest technology of LOYTEC in the Continente Hypermarket in Matosinhos, Portugal.
Hypermarket in Alor Setar - Kedah, Malaysia 2014
Devices: LINX-110, LIOB-151, LIOB-152, LIOB-153, LWEB-900
The LOYTEC partner M&C Engineering and Trading Sdn Bhd implemented a project for a new hypermarket in Alor Setar - Kedah, Malaysia. There, LOYTEC’s powerful LINX-110 Automation Servers extended with L-IOB I/O Modules are in charge of controlling and monitoring the hypermarkets’ systems.
Quartier 17, Hanseatic City Stralsund, Germany, 2014
Devices: LINX-120, LIOB-100, LIOB-101, LIOB-120, LIOB-A2,
LIOB-450, LVIS-3E100, LPOW-2415A, LIP-33ECTB
A project of the LOYTEC Competence Partner Dr. Diestel regarding control and visualization of different room air conditioning systems of the newly built Quartier 17 in the Hanseatic City Stralsund in Germany.
Heatherbrae Elementary School, Arizona, USA, 2014
Devices: LIOB-484, L-IP Router
The LOYTEC Competence Partner Mechanical Products BAS (MPBAS) implemented in conjunction with the manufacturer DeVenthere Industries a fully integrated, demand controlled ventilation and heat recovery system (DVHR) with added free cooling capability meeting the ASHRAE standards 189.1 and 62.1 for Heatherbrae Elementary School.
Camões Building, Porto, Portugal, 2014
Devices: LINX-220, LINX-210, LINX-110, LIOB-150, LIOB-151
LIOB-152, LIOB-100, LIOB-101, L-MBUS
The Camões Building is used as headquarters of the Court of Criminal Investigation (ICT) and the Department of Investigation and Penal Action (DIAP). The LOYTEC Competence Partner RACE implemented the project with LOYTEC equipment. The project comprises the refurbishment of the building including maintenance and conservation work.
Shopping Center Allegro, Setúbal, Portugal, 2014
Devices: LINX-220, LINX-210, LINX-110, LIOB-150, LIOB-151
LIOB-152, LIOB-100, LIOB-101, L-MBUS
The shopping center Allegro Setúbal resulted from a Jumbo hypermarket enlargement. The integrated building automation solution was developed and installed by the LOYTEC Competence Partner RACE and is controlled and monitored by LOYTEC components.