Case studies

delta emea headquarter hoofdorp 2017

The renovation and upgrade of the existing office building in Hoofddorp transforms the Delta EMEA Headquarters into a modern working environment. Impressive results you need to read about!

Ishbylia

For the development of the educational buildings the Ministry of Education in Kuwait asked for a central BMS. Ahmed Ishaq Co. presented an innovative solution building on LOYTEC technology. 

Baden-Baden

Langestraße 100 in Germany is a newly built 5-star rated design hotel with 130 spacious rooms and suites, a state-of-the-art medical center with 15 medical specialists, an apartment building with 16 flats and a two-storey underground garage with 200 parking spaces.

ParkLake

"A new shopping experience in a space that combines an environmentally friendly design with a distinctive range of leisure and sport."

Zhaoquing Railway

Delta GreenTech and LOYTEC Work Hand-in-hand on China’s Next-Gen Railway Station

Hontai Plaza

Paragon of Intelligent Building Management

Devices: LDALI-ME204

Manchester Airport

After the successful implementation of a lighting control system for the public areas of Manchester Airport's terminal 2, the LOYTEC Competence Center Calon in cooperation with the company Building Environment Control, have now extended the very same lighting control solution to the public areas of the airport’s terminals T1 & T3.

Devices: LINX-220LIOB-151, LIOB-152, LIOB-453,
 
LVIS-3ME12-A1, L-MBUS80LWEB-900

Continente Hypermarket, Braga Nova ArcadaThe LOYTEC Competence Partner SISTAVAC installed a total control solution for the Continente Hypermarket, Braga Nova Arcada based on LOYTEC components. The solution integrates all systems of the store from refrigeration to HVAC and lighting and allows for increased energy efficiency and transparent management of the technical equipment.

Devices: LINX-220LINX-211LINX-212LINX-203,
LIOB-10xLIOB-15xLVIS-3ME12-A1LIOB-AIR2LWEB-900

Royal Australian Air Force BaseThe Royal Australian Air Force Base is located in Perth, Western Australia, and is one of the largest LOYTEC sites in Australia. The LOYTEC Competence Partner Building Control Systems introduced the LOYTEC system to the Australian Defence Force, when an upgrade and a standardisation to more common technologies and communication platforms were required.

Devices: LINX-211LIOB-550LWEB-803

Parmelia HotelThe company BCS was commissioned to upgrade the existing Chiller Controls in the Parmelia Hilton. The new system provides the hotel operator with improved monitoring and control features and delivers extensive experience values for energy efficient operations.

Devices: LINX-220, LINX-221, LIOB-580, LIOB-10x,
LIOB-15xLWEB-803, LWEB-802 

Fremantle_Esplanade_HotelThe LOYTEC Competence Partner Building Control Systems was engaged to replace the existing building management system of the Rydges Hotel in Fremantle, a heritage listed 4.5 star hotel.

Devices: LINX-220LINX-221LIOB-580LIOB-10x,
LIOB-15xLINX-211LIOB-55xLWEB-900

City of RockinghamThe LOYTEC Competence Partner Building Control Systems was engaged to modernize the existing BMS of the City of Rockingham – a local city council – for a reliable and accurate operation

Devices: LDALI-ME204, LVIS-ME212LDALI-PWR4-ULPOW-2415B

OBI market NurembergThe OBI home improvement store in Nuremberg, a two-story building with a retail area of approximately 12,000 m2, was built in February 2014. For lighting control the building automation system was equipped with a LOYTEC DALI lighting system. 

Devices: LINX-120LIOB-100LIOB-101LIOB-102LIOB-A2,
 LVIS-3ME12-A1LPOW-2415AL-MBUS20LWEB-900

NSC SchlumbergerThe subsidiary of Arcom, Arcom Alsace Lorraine installed a building automation system that allows the Schlumberger factory to be monitored and managed completely automatically while allowing the users to override the system locally.

Devices: LDALI-3E102, LDALI-3E104LINX-111,
LDALI-PWR2-U, LDALI-PWR4-U, L-VIS

NAPP Pharmaceuticals, Cambridge, United Kingdom, 2015NAPP Pharmaceuticals based at the Cambridge Science Park in Cambridge employed both the consultancy and engineering divisions of the LOYTEC Competence Partner SGCI for the design and commissioning of a complex lighting control solution based on the open standard of DALI. 

Devices: LINX-150, LINX-111, L-IOB I/O,
LIOB-180, L-VIS, LPOW-2415A, LPOW-2415B

University of Lincoln, Think Tank, Lincoln, United Kingdom, 2015The Lincoln University approached the LOYTEC Competence Partner SGCI to come up with a cost viable solution to replace the old building management system with the caveat to drastically improve user comfort within the building and occupied spaces as well as reducing energy consumption.

Devices: LINX-121, LIOB-150, LIOB-152, LIOB-151, LWEB-802

PAMA fahd al ahmad branch, Kuwait, 2015The LOYTEC Competence Partner Ahmed Isaq Co. integrated electrical and mechanical systems in the PAMA fahd al ahmad branch in Kuwait, the seat of the public authority of minority affairs.

Devices: LINX-151, LIOB-550, LDALI-3E104, LDALI-PWR4-U, LDALI-MS1, LWEB-900

PAMA west al jahra branch, Kuwait, 2015Another PAMA branch, the seat of the public authority of minority affairs in Kuwait was automated by the LOYTEC Competence Partner Ahmed Isaq Co. However, this building is more advanced than the other branch, fahd al ahmad, as additionally L-DALI lighting control is used for all building offices and corridors.

Devices: LIOB-484, LIOB-480, LIOB-451, L-POW, LIP-3ECTB

Poinciana High SchoolThe LOYTEC Competence Partner TBI was awarded the project of replacing the building automation system in the oldest area of Poinciana High School. The project consisted of 37 AHUs (Air Handling Units), 2 chiller plants and 164 VAV (Variable Air Volume) units.

Devices: LINX-150/151 L-IP L-Switch LIOB I/O Module
LIOB I/O ControllerLENO-800, LWEB-803

MR-TechThe great challenge for MR-Tech in the project Business Park Vienna was to use a technology for the tenant-specific improvements that both integrates existing components and systems and also guarantees interoperability.

Devices: LIP-3333ECTB, LIP-33ECTBLINX-150/151,
LIOB-100/101LIOB-A2L-ProxyLT-33L-MBUS20

District Office Sigmaringen

At the end of 2014, the extension of the district office in Sigmaringen, Germany was completed. The four-storied office building with 8,300 m2 accommodates 190 employees.

Devices: LINX-221, LIOB-582, LVIS-3ME212-xx
LIOB-101/LIOB-102

AIM Recycling CenterThe AIM recycling center, the most advanced dry material recycling facility in North America, received a new building and dust collection automation system from the LOYTEC Competence Partner AIREX CONTROLS Inc.

Devices: L-INX, LVIS-3ME15-xx, LWEB-900

Hotel Management School BelvoirparkPentaControl AG implements the building management system for the hotel management school Belvoirpark, Switzerland’s most modern hotel management school! LOYTEC’s intelligent BMS LWEB-900 ensures the perfect control of heating and cooling, ventilation, and also room ambiance.

Devices: LINX-220LINX-210, LIOB-A2, LIOB-100/101/102,
LIOB-150, LIOB-151, LWEB-900

Secondary School Loulé, Algarve, Portugal, 2015In the course of Portugal's Secondary School’s Modernization Program, the secondary school Loulé in the Algarve region has been modernized by Sistavac using LOYTEC products. 

Devices: LINX-151, LIOB-550, LPOW-2415A, LPOW2415-B,
LDALI-PWR2-ULDALI-E101-ULDALI-3E102LWEB-900

Fire Directorate, KuwaitThe Kuwait fire directorate is Kuwait’s first building that is considered to be a smart and green building. The building was automated by the LOYTEC Competence Partner AHMED ISHAQ CO. using LOYTEC components.