EnglishDeutsch
News by RSS
feed image
Buildings under Control Symposium Print

The Buildings under Control™ Symposium 2009 is addressing system integrators, specifiers, developers, sales / marketing staff, and consultant engineers worldwide. Besides educational presentations, products and system concepts are shown and explained in detail by our developers in an exhibition area.

The symposium is organized in a way that market requirements, products and system concepts are discussed on Sept. 8 (Day 1) and Sept. 9 (Day 2). Live product demos will be presented on Sept. 10 (Day 3). Hence, every attendee can concentrate his focus (marketing/sales or technical) to the various sessions.

The conference language is English. Presentations on Day 1 and Day 2 will be given in English. Technical presentations on Day 3 will be given in English and in German language.
Info and Agenda: BuCS2009_Flyer (390 kB)


palais_eschenbach_floorp.gif

Presentations of the Buildings under Control Symposium can be downloaded
within the agenda.
To simply download all presentations together, a zip-file (60 MB) was created: 

Effective: 2009-09-12

Tuesday, 2009-09-08

System Design Methods and New Products

 

Building under Control Symposium
(Festsaal)
Building under Control Exhibition
(Exnersaal, Arthaberzimmer)
12:00 Registration
12:30 Light Lunch
Exhibition
13:15 download Welcome  
13:30
download LOYTEC Solutions

This presentation shows LOYTEC's core competence and shows how this core competence is used to build best fitting product solutions for the Building Automation and the Connected Real Estate Market.
 
14:15
download Newron System Middleware for Building Management Systems

Introduction of a PC-based multi protocol operating system. Learn more about the innovative framework including a multi protocol network management and a multi protocol data server.
 
15:00
Coffee Break
Exhibition
15:30
download BACnet News (Cimetrics)

Presentation of new BACnet addendums including updates concerning new objects. Where is BACnet heading to? Outlook by Cimetrics, the pioneer in open system communication for building automation.
 
16:00
download DALI Update (Tridonic)

Presentation of DALI and new Functions defined for DALI.
 
16:30
download New L-DALI Products

Presentation of new L-DALI Gateways with implemented Automation Functions for integrating one, two, or four DALI channels into a CEA-709 network.
 
17:00 Coffee Break  Exhibition
17:30 download New L-VIS Touch Displays

Presentation of new L-VIS Touch Displays with 12" and 15" displays for CEA-709 and BACnet networks.
 
18:00 download LOYTEC Competence Partner

Presentation of the Competence Partner Network. Competence Partners can offer services built around the LOYTEC product portfolio. With continuing education and training by LOYTEC, the independent Competence Partners can offer high level services in their local country and language.

 
18:15 Dinner
19:30 LOYTEC Open House Tour
LOYTEC electronics GmbH
Blumengasse 35
1170 Vienna
23:00 End

Wednesday, 2009-09-09

   System Solutions and Product Direction

 

Main Track
(Festsaal)
Building under Control Exhibition
(Exnersaal, Arthaberzimmer)
 8:30 Registration / Coffee
 9:00 Welcome / Session Preview  
 9:15
download L-INX Automation Server - System View

L-INX Automation Servers are the most flexible integration platform for today’s building automation systems. This presentation gives an overview of different system architectures for single buildings and connected real estate based on L-INX Automation Server in combination with other LOYTEC and third-party products.
 
 9:30
download LINX-10x and LINX-20x Automation Server

Presentation of the LINX-10x and LINX-20x Automation Servers with its embedded OPC XML-DA Server, the support of different communication technologies (OPC, CEA-709, BACnet, M-Bus, Modbus) and integrated Automation Functions (Alarming, Scheduling, Trending). Application examples show the possibilities of the L-INX Automation Server.
 
10:30 Coffee Break Exhibition
11:00
download Data Logging and Storage with LWEB-801

The software application is an add-on to the family of the L-INX Automation Servers. It allows logging and storage of data in SQL databases by using different communication channels.
 
11:20
download Reporting with Dream Report™

This real time reporting software allows access to data provided by LWEB-801. Application examples show flexibility and efficiency using the reporting software.

 

11:40 download LOYTEC Master Schedule

LOYTEC presents a new concept for distributed scheduling. The Master Schedule is an add-on to the LWEB-801 and allows the most flexible handling of distributed scheduler in single buildings or real estate.
 
12:15 Lunch
13:15
download Visualization with LWEB-800

The .NET application is an add-on to the LINX-10x and LINX-20x to visualize customized graphics hosted by the Automation Server. This presentation shows the system concept for designing comprehensive user interfaces handling different communication technologies and systems. Application examples show the usage for plant and room control.
 
14:15
download LINX-11x/21x Automation Server

Using programmable LINX-11x and LINX-21x Automation Servers. IEC 61131-3 explained with possible workflows for device commissioning. Practical application examples will be provided.

 

15:00
Coffee Break
 Exhibition
15:30
download Intelligent Infrastructure

LOYTEC offers a wide range of infrastructure products for CEA-709 and BACnet networks. LOYTEC today offers application specific devices such as the L-INX Automation Server with built-in network interface and router functionality. A discussion on the benefits of using intelligent infrastructure components commissioning control systems.
 
16:00 download Connectivity

This presentation explains the requirements for connecting real estate using Internet/Intranet communication.
 
16:30
download Flexibility

Newron Systems NLFacilities - New concepts for time-saving integration of different systems.
 
17:15
New LOYTEC Platform and Roadmap

Roadmap 2010 - More powerful system platform for LOYTEC products.
 
17:30 Session End
17:45 Guided Vienna Tour followed by Dinner
23:00
End

Thursday, 2009-09-10

Technical Instruction and Commissioning Methods

  English Track
(Festsaal)
Exhibition
(Exnersaal, Arthaberzimmer)
German Track
(Präsidentenzimmer)
 8:30 Coffee
 8:45 download Welcome
 9:00
download LOYTEC's Data Point Manager

Handling data points from different technologies (CEA.709, BACnet, OPC). Practical presentation with the focus on L-GATE.
 Exhibition  download NL220 Network Management Tool

Advanced features of NL220 helping to decrease integration time and to automate actions.
10:00 download L-VIS Touch Panel

Demonstration of commissioning methods for the different L-VIS devices. Create a customized room control panel application.
de.gif download LOYTECs Datenpunktmanager

Handhabung von Datenpunkten unterschiedlicher Technologien (CEA-709, BACnet, OPC). Praktische Anwendung mit dem Fokus auf L-GATE.
10:45 Coffee Break Coffee Break
11:00
download L-WEB Product Family

Online demonstration of the LWEB-800 Visualization, the LWEB-801 Server, and the LWEB-820 Master Schedule Configurator.
de.gif download L-VIS Touch Panel

Präsentation von Methoden zur Inbetriebnahme der verschiedenen L-VIS Touch Panels. Erstellen einer Raumbediengerät-Applikation.
12:00
download LINX-11x/LINX-21x and L-logiCAD

Demonstration of commissioning methods for the LINX-11x or LINX-21x Automation Server and the IEC 61131-3 tool L-logiCAD.Create an HVAC application.
de.gif download L-WEB Produktfamilie

Online-Präsentation der L-WEB-Anwendungen LWEB-800 Visualization, LWEB-801 Server und LWEB-820 Master Schedule Configurator.
12:45 Lunch & Exhibition
13:45
MooV'n'Build

Presentation of a multiprotocol network management tool. (Newron System)
Exhibition
de.gif download LINX-11x/LINX-21x und L-logiCAD

Präsentation von Methoden zur Inbetriebnahme von LINX-11x oder LINX-21x Automation Servern und des IEC 61131-3 Tools L-logiCAD. Erstellen einer HLK-Applikation.
14:45
download Pre Commissioning and Post Commissioning

Tools and workflow. (Newron System)
de.gif download L-DALI Gateways

Präsentation von Inbetriebnahmemethoden für die verschiedenen L-DALI Gateways. Integration von DALI-Beleuchtungssystemen.
15:30 download L-DALI Gateways

Demonstration of commissioning methods for the different L-DALI Gateways. Integration of DALI lighting systems.
 
16:15
Conclusions and Farewell
16:30
End of the Building under Control™ Symposium