The building automation of the new royal netherlands
embassy in Berlin, Germany was implemented
using network infrastructure
components from LOYTEC.
Interesting
Facts
Location
Berlin, Germany
Number of Nodes
> 300
Topology
6 L-Switch devices connected by a collision-less
TP-1250 backbone; a TAC Vista IV is connected to the backbone via
a separate TP-1250 port of one L-Switch.